The proposal will seek to achieve:
- 35% reduction over current Part L Building Regs in line with the London Plan
- Use of low carbon technology air source heat pumps for heating and cooling
- Thermally efficient materials specified within the facade
- High quality materials with good longevity
- Deep window reveals and panelled balustrades to aid solar shading
- MVHR for summer and winter ventilation
- Biosolar green roof/PVs